OpsSync AI

15-second factory flow simulation: static scheduling vs AI coordination.

Phase A - Static SchedulingPhase B - AI Coordination
AI OFF
0.0s / 15.0s1x
OpsSync AI - ON

Utilization

0.0%
Share of total machine time spent actively processing work.

Downtime

0.0%
Share of time machines are unavailable because of short failures.

Bottlenecks

0
Machines flagged overloaded by queue depth or expected completion time.

Throughput

0.00/s
Completed tasks per second over the rolling live window.

Live Trend

UtilizationDowntimeBottlenecks
Green tracks utilization, amber tracks downtime, and red tracks bottlenecks across the 15-second run.

Before vs After AI

Utilization delta+0.0%
Downtime delta+0.0%
Queue moves0
Compares average Phase A performance against Phase B once AI coordination turns on at 6.0 seconds.

Controls

Seed: 1337
Replay the same seed or change arrivals, failures, and AI move capacity to stress coordination behavior.
How much new work enters the factory each simulated second.
Chance that a machine goes down, creating short disruptions and waiting time.
Maximum queued tasks the AI can move per second after the coordination layer turns on.